LeanSteel: Design. Build. Better.

Michigan Seamless Tube Pilger Mill

A skilled worker is lifted by a crane as they work on the steel frame of the Michigan Seamless Tube Pilger Mill.

South Lyon, Michigan Supporting a new pipe manufacturing process for a 90-year old company. Ruby has a longstanding relationship with MST, a manufacturer of seamless tubes and pipes, having provided services to the 90-year old company for over 30 years. Constantly evolving with adaptive technologies, the company had purchased large German equipment for an exciting […]

Martin Drake Power Plant

A crane lifts a large component of the Martin Drake Power Plant.

Colorado Springs, Colorado 2015 Tekla BIM Award Winner. Colorado Springs Utilities constructed and commissioned innovative technology to reduce SO2 emissions at one of its power plants. During pilot testing of the technology, researchers determined the best configuration of ductwork for the system was a combination of reinforced fiberglass (FRP) with a steel exoskeleton. The benefits […]

Iatan Generating Station

A crane lowers a section of the Iatan Generating Station into place.

Weston, Missouri AP ComPower and Kansas City Power and Light were installing boiler and selective catalyst reduction (SCR) equipment at this coal-fired plant. Because this equipment is irregularly shaped, Ruby worked hand-in-hand with the owner’s on-site personnel to develop lifting procedures that would utilize available rigging equipment while accommodating congested field conditions. A LeanSteel® approach […]