Ultium Cell Battery Plant 3
Lansing, Michigan Building on the success of the Ultium 2 Cells Battery Plant Facility The 3rd of the U.S.-based Ultium
GM Manufacturing Body Shop Program
Flint/Ft. Wayne/Arlington/Silao, Michigan, Indiana, Texas and Mexico Working with a co-located multi-disciplinary team to complete a $1 billion program. As
GM Body to Paint Shop Conveyor
Arlington, Texas Engineering a true ‘out-of-the-box’ solution with a rooftop conveyor system. For this project, which included adding a rooftop
GM Technical Center Pedestrian Bridge
Warren, Michigan Engineering a connector quickly, using an expedited design and detail process. GM’s goal of creating a more collaborative
Truck Diesel Engine Plant
Brookville, Ohio Designing a lighter, more efficient design for an automotive owner with a compressed schedule. Ruby was asked to
Michigan Seamless Tube Pilger Mill
South Lyon, Michigan Supporting a new pipe manufacturing process for a 90-year old company. Ruby has a longstanding relationship with
Martin Drake Power Plant
Colorado Springs, Colorado 2015 Tekla BIM Award Winner. Colorado Springs Utilities constructed and commissioned innovative technology to reduce SO2 emissions
Iatan Generating Station
Weston, Missouri AP ComPower and Kansas City Power and Light were installing boiler and selective catalyst reduction (SCR) equipment at
St. Vincent Mercy Medical Center Heart Pavilion
Toledo, Ohio Construction of 144,000 square foot facility for medical campus. As partners in the Design/Build (D/B) delivery of the
Mercy Hospital of Tiffin
Tiffin, Ohio Valuable time spared with the electronically transmitted design of a complex 3-story hospital. Mercy Health Partners constructed a
Mercy Hospital of Willard
Willard, Ohio Improving efficiency with computer-modeled design. Mercy Health Partners’ two-story, 105,000-square-foot hospital, utilized Ruby+Associates to perform the structural design, and incorporate