GM Technical Center Pedestrian Bridge
Warren, Michigan Engineering a connector quickly, using an expedited design and detail process. GM’s goal of creating a more collaborative environment for its engineering teams within the separate Estes and Cole Engineering Center buildings was realized with the design and construction of a 310-foot, 140-ton pedestrian connector between the two buildings. For our client Ideal […]
Truck Diesel Engine Plant
Brookville, Ohio Designing a lighter, more efficient design for an automotive owner with a compressed schedule. Ruby was asked to provide structural design, connection design, shop fabrication details, erection stability analysis and on-site coordination for a new 250,000 square foot automotive diesel engine plant on 60-80 acres near Dayton, Ohio. The fast-paced design/build LeanSteel® project […]